






![]() | Hari ini | 653 |
![]() | Kemarin | 1584 |
![]() | Minggu ini | 5470 |
![]() | Bulan ini | 12680 |
![]() | Semua | 713198 |
| Counting Needs Compost |
|
How to Use and Calculate Needs Compost To determine the levels of organic C content in the soil, should be done with laboratory analysis. To find out how much fertilizer needs of organic C, can be done in a way to use the following formula: Needs Compost (organic C) = C Organic Soil x 1724 x 20 cm x 10,000 m 2 = Soil organic C determined by soil analysis in the laboratory 1724: 20 cm constant: if the soil layer depth of 10,000 m 2: area As an illustration, if the results of laboratory analysis of soil organic C content is known in some places the soil was 2.56%, then calculate the soil organic C content in the layer if (20 cm) 1 hectare is: Organic C content of the soil layer is though = 2:56 x 1.724 x 20 x 10,000 = 8800 kg / ha = 8.8 tons / ha Meanwhile there is also a mengelompokan levels of soil organic matter in general, as can be seen in the following table:
Thus providing organic fertilizer recommendation is based on the lack of organic C content in the soil. As an illustration can be argued that if based on laboratory analysis of soil, soil organic C content is 2.56% equivalent to 8.8 tons / ha, then based on the state of the organic C level soil fertility, soil organic content is at a low level. The precise needs of organic fertilizer, is highly dependent on soil type and plant species. This new situation will be known by more accurate if done field testing. But with the help of a guide soil fertility levels in table 5 above, may be generally known that to achieve the level of soil fertility, organic C was, ie 13.79 s / d 34.48 tons / ha, it would require the addition of organic fertilizer for = (13.79 s / d 34.48 ) - 8.8 tons = 4.99 s / d 25.4 tons / ha.
|