| Making biogas 3 |
|
PART 3 - Inflate the biogas plant After both pipe installed properly, the next step is to move the plant into the 'house' is trench that has been made before. To move the plastics plant is recommended to inflate the plastic first so that power plants can 'sit' with the neat and filled the room with a good trench. In addition inflate function is to ensure that all connections have been installed properly. ![]() Generating inflating ![]() Setting up biogas plant. Plant could be installed. Once it clicks into place. Inlet pipe attached to the outlet hole of the tub mixer and paired stoppers, while the gas outlet pipe outlet and we let it remain closed. After this installation, charging could be done. Installing generators ![]() Filling in Livestock Manure